Provision of Bundle Pulling and Installation Services at EGTL Process Facility

Bundle pulling and installation services across process heat exchanger systems at the Escravos Gas-to-Liquids facility delivering controlled maintenance intervention, reduced shutdown exposure, and restored thermal equipment operability.

Completed Nigeria
Provision of Bundle Pulling and Installation Services at EGTL Process Facility
Location Escravos Gas to Liquid (EGTL) Plant
Client Type International Oil & Gas Operator
Year 2026
Status Completed
Service Area Offshore/Onshore Construction & Installation Division

The Challenge

The Escravos Gas-to-Liquids (EGTL) facility required controlled bundle pulling and reinstallation activities within an operational hydrocarbon processing environment. The intervention involved large-diameter exchanger bundles integrated within critical process systems where access constraints, lifting coordination, and shutdown schedule exposure presented significant execution risks.

The work scope demanded precise mechanical handling, coordinated lifting operations, and alignment control to prevent tube damage, flange integrity issues, and extended maintenance downtime. Brownfield operating conditions, elevated piping infrastructure, and confined access areas further increased execution complexity.

Execution planning prioritized controlled extraction methodology, lifting path management, personnel safety coordination, and minimized disruption to adjacent operating systems.

Our Approach

Fairtex deployed a dedicated mechanical intervention team to execute exchanger bundle pulling and installation activities under controlled lifting and maintenance procedures. Activities were coordinated alongside plant maintenance personnel to support safe isolation, staged removal, inspection access, and reinstallation readiness.

Specialized bundle extraction equipment and hydraulic pulling systems were utilized to manage controlled movement of exchanger internals while maintaining tube sheet alignment and equipment integrity throughout the intervention cycle.

Execution activities included:

  • Pre-job mechanical and lifting assessment
  • Exchanger opening and access preparation
  • Bundle extraction and controlled handling
  • Inspection access support coordination
  • Bundle reinstallation and alignment verification
  • Flange management and bolting support
  • Post-installation integrity checks
  • Shutdown coordination and worksite control

Phased Delivery

Assessment & Planning

The maintenance scope was reviewed to establish lifting requirements, exchanger access limitations, scaffold interfaces, and shutdown execution sequencing.

Mobilization

Mechanical crews, lifting accessories, hydraulic bundle pulling equipment, and safety systems were mobilized to support continuous maintenance execution within the processing facility.

Bundle Extraction & Intervention

Controlled extraction activities were executed using aligned pulling systems designed to minimize mechanical stress on exchanger components while enabling inspection and maintenance access.

Reinstallation & Alignment

Following maintenance completion, exchanger bundles were reinstalled under monitored alignment procedures with coordinated flange reinstatement and mechanical verification activities.

Validation & Handover

Final reinstatement checks and mechanical confirmation activities were completed prior to system handover for operational reintegration.

Outcome

The project supported planned maintenance execution across critical process equipment while reducing shutdown schedule exposure and preserving exchanger system integrity throughout intervention activities.

Fairtex delivered coordinated mechanical handling services within active industrial conditions while supporting safe execution, controlled lifting operations, and operational continuity objectives at the EGTL facility.

Project Outcomes

Measured against procurement KPIs.

The intervention supported controlled maintenance execution across critical exchanger systems within an operational gas processing environment.

Completed
Mechanical Integrity Support
Bundle extraction and reinstallation activities were executed under controlled mechanical handling procedures.
Supported
Shutdown Coordination
Execution activities were aligned with maintenance scheduling requirements to reduce operational disruption exposure.
Controlled
Equipment Handling
Hydraulic bundle pulling systems and monitored lifting procedures supported safe exchanger intervention activities.
Maintained
Operational Continuity
Work execution was coordinated within active brownfield processing conditions with controlled access management.
"

Fairtex executed the exchanger intervention scope with structured lifting coordination and controlled mechanical handling throughout the maintenance window.

Operations Manager